银河galaxy娱乐(中国)有限公司

plastic flooring manufacturers - Da julong flooring

全国统一服务热线

15821396693
Construction technology and maintenance of Coiled floor

时间:2021-07-30 05:56:40 访问量:1223

 

Coiled floor construction


Pre paving and cutting

  Place it on the site for more than 24 hours to restore the memory of the material, and the temperature is consistent with the construction site; Use a special trimming device to cut and clean the rough edge of the coil; There shall be no joint between the two pieces of material.


Paving

  Select the corresponding glue and rubber scraper suitable for PVC floor; Please turn the coiled material from the middle to both sides, clean the ground and the back of the floor, and then glue and paste it; The requirements of different adhesive agents will be different during construction. Please refer to the corresponding product instructions for construction.


Exhaust and rolling

  Push the floor surface with softwood blocks for leveling and extrude air; Roll the floor evenly with 50 or 75 kg steel roller and trim the edge warping at the splice in time; Wipe off the excess glue on the floor surface in time; Grooving and welding shall be carried out after 24 hours.


slotting

  It must be carried out after the glue is completely cured. Use a special slotter to slot along the joint to ensure firm welding; It is suggested that the slotting depth should be 2 / 3 of the floor thickness.


Slit

  At the end where the slit cannot be cut, please use the manual slit to slit with the same depth and width.

weld line

  The residual dust and debris in the groove must be removed before welding
   1. Manual welding gun or automatic welding equipment can be selected for welding;
   2. The temperature of the welding gun shall be set at about 350 degrees;
   3. Squeeze the welding rod into the opened groove at an appropriate welding speed (ensure the melting of the welding rod);
   4. When the welding rod is half cooled, the part of the welding rod higher than the floor plane shall be roughly cut off with the welding rod leveler or month cutter;
   5. After the welding rod is completely cooled, use the welding rod leveler or month cutter to cut off the remaining convex part of the welding rod.

 


上一篇:Construction technology and maintenance of SPC floor

下一篇:没有了!

企业地址:

总部地址:上海新金山工业园区金腾路1106号

华北分部:北京市通州区尚品台湖 石家庄中冶国际广场

卡曼工厂:上海新金山工业园区金腾路1106号

华南分部:浙江省嘉兴县嘉善姚庄镇

展厅暨仓储中心:

联系电话:

全国统一服务热线:021-60500084

招商热线:张小姐  13795233793

郭先生  15821396693

大巨龙北京营销中心:张小姐13911243276

大巨龙河北营销中心:郭先生13699142298

大巨龙内蒙营销中心:张先生18513242555

大巨龙山西营销中心:董先生18003317790

大巨龙天津营销中心:袁长友 13021363922

大巨龙安徽营销中心:邹先海 15221369906

大巨龙新疆营销中心:胡先生 18703219993

大巨龙华东营销中心:张女士 13795233793

大巨龙海南营销中心:王先生 18612411131

大巨龙福建营销中心:胡新军 13313853038

tel:15821396693 Address: Jin Teng Road, Jinshan District, Shanghai E-mail:dajulongfloor@126.com网站地图

银河galaxy娱乐|银河galaxy娱乐

XML 地图 | Sitemap 地图